Jump to content
SalamanderSoup

Capture Screenshot using snipping tool

Recommended Posts

I've created a simple script that opens the Snipping Tool; Selects the "Full Screen Snip" option; then closes the program, prompting a save.  What I can't figure is how to name the file using the system date and time.

Can anyone help?

Run(@WindowsDir & '\system32\SnippingTool.exe')
AutoItSetOption('MouseCoordMode', 0)

Sleep(1)
$hWnd= WinWait("Snipping Tool", "ToolBarWindow32", 1)
WinActive($hWnd)
MouseClick('primary', 84, 48, 1, 0)
MouseClick('primary', 84, 140, 1, 0)
WinClose("[Class:Microsoft-Windows-Tablet-SnipperEditor]")

ControlClick("Snipping Tool", "", "Button1")

 

 

 

 

Share this post


Link to post
Share on other sites

@SalamanderSoup moved your topic to General Help and Support, as you seemed to have missed this at the top of the Examples forum:

Do not post general support questions here, instead use the AutoIt Help and Support forums.

 

Share this post


Link to post
Share on other sites

Probably because windows wont allow you to save a file with back slashes/forward slashes\ in it.

Try using _NowDate() and StringReplace and replace the " / \ " with "." for instance...

 

p.s. unless you are dead set on using SnippetTool, Autoit has a very cool function called:

_ScreenCapture_Capture that does this job very well ;)

Edited by l3ill
p.s.

Share this post


Link to post
Share on other sites

Thanks l3ill, could you possibly give me an example of how the NowDate and StringReplace scripts might look together?  I've looked at the AutoScript Help File, and still feel a bit confused at how I should code it.  I'm very new at this.

3 hours ago, l3ill said:

Probably because windows wont allow you to save a file with back slashes/forward slashes\ in it.

Try using _NowDate() and StringReplace and replace the " / \ " with "." for instance...

 

p.s. unless you are dead set on using SnippetTool, Autoit has a very cool function called:

_ScreenCapture_Capture that does this job very well ;)

Share this post


Link to post
Share on other sites

Here is your script.

#include <Date.au3>
#include <ScreenCapture.au3>

$filename = _NowDate()
;                         String     Find Replace
$filename = StringReplace($filename, "/", ".")

; I'm guessing fixed location wants the cursor off
;                      Filepath      \    Filename    .Type   x1  y1  x2  y2   Capture Mouse Cursor
_ScreenCapture_Capture(@ScriptDir & "\" & $filename & ".png", 84, 48, 84, 140, False)

It's only programmed to read 1 pixel width, but I hope you know that already.

If you want a BMP or something else you can change the type ".png"

Edited by Xandy

Share this post


Link to post
Share on other sites
4 hours ago, l3ill said:

Nice follow up Xandy...

I hope this is not going to be too expensive ;)

I try SO hard!

Your advice gave me a concise path to victory.

2 hours ago, SalamanderSoup said:

I was able to add the system time to the file name, as well.

Then you're learning and all is well.  There's nothing wrong with eating a free fish, unless you're the fish.

Share this post


Link to post
Share on other sites
15 hours ago, SalamanderSoup said:

Lol, I'd buy that script for a dollar!

Just put a one dollar note in your cdtray and run

FileCopy('path to cdtray\one dollar.$$$','https://www.autoitscript.com/donate')

The dollar will transfered asap.  :lol:

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Similar Content

    • By Jeep
      Here is an other UDF for string handling :
      Date handling
      _StringDateConvert:  convert a date from one format ("YMD", "MDY" or "DMY") to another.
      _StringIsDate:  checks if a date with a given format is valid
      String management
      _StringCount: count of occurrences that appear in a string
      _StringFormatBytesSize: formatting a dimension expressed in bytes (bytes) in MB, TB, ...)
      _StringIsEndingWith: check if a string end with some characters
      _StringIsStartingWith: check if a string start with some characters
      _StringJoinArray:  concatenate elements of an array to rebuild a string
      _StringPadLeft: filling a string with characters on the left
      _StringPadRight: fill a string with characters on the right
      _StringRemoveFrenchAccent: remove french accent
      _StringRemoveChars: deleting characters from a string
      _StringStrip: eliminate characters at the begin and/or at the  end of a string
      _StringTitleCaseFrench: capitalize the first letter of each word with elimination of french accents
      _StringWSClean: simple replacement of "White Spaces",  remove beginning and trailing spaces and multiple spaces removal
      Any comments, suggestions for improvement or constructive criticism are welcome.
      Below you will find the UDF and a demo program. 
       
       
      JPD_String.zip
    • By Skeletor
      Hey All,
      I'm trying to set the date using a variable.
      Basically, I set the date into the input box, then I change the input box, say, I change the year.
      Then I set what I typed into the input box into the Date Picker.

      This is a demo code.
      #include <ButtonConstants.au3> ;Start GUI includes #include <EditConstants.au3> #include <StaticConstants.au3> #include <WindowsConstants.au3> #include <DateTimeConstants.au3> #include <GUIConstantsEx.au3> #include <GuiDateTimePicker.au3> #Region ### START Koda GUI section ### Form= $Form1 = GUICreate("Form1", 615, 438, 192, 124) $Date1 = GUICtrlCreateDate("2019/02/02 23:16:26", 80, 64, 186, 21, $DTS_SHORTDATEFORMAT) $Input1 = GUICtrlCreateInput("Input1", 80, 152, 185, 21) $Button1 = GUICtrlCreateButton("Set data", 176, 96, 75, 25) $Button2 = GUICtrlCreateButton("Read from input", 176, 200, 75, 25) GUISetState(@SW_SHOW) #EndRegion ### END Koda GUI section ### While 1 $nMsg = GUIGetMsg() Switch $nMsg Case $GUI_EVENT_CLOSE Exit Case $Button1 $Read = GUICtrlRead($Date1) GUICtrlSetData($Input1, $Read) MsgBox(-1, "", $Read) Case $Button2 $Read = GUICtrlRead($Input1) $New_date = StringReplace($Read, "/", "") $DAY = StringLeft($New_date, 2) $MON = StringMid($New_date, 4, 3) $YEAR = StringRight($New_date, 4) MsgBox(-1, "", $DAY & $MON & $YEAR) ;_GUICtrlDTP_SetFormat($hWndDate, "yyyy/MM/dd") $DateFormate = ($DAY & " " & $MON & " " & $YEAR) $DTM_SETFORMAT_ = 0x1032 ; $DTM_SETFORMATW GUICtrlSendMsg($Date1, $DateFormate, 0, "MM/dd/yyyy") EndSwitch WEnd  
    • By nooneclose
      I forgot an important and needed aspect of my code. I need to be able to check for people who work every other week. Is it possible to write the dates that they work (every other week) between two date ranges? 
      Example:  Bob Smith has a Start date of 8-26-2018 (that is the date he is hired) And He stops working on 12-12-18 (that's the day he goes on vacation or whatever) However his work shift is every other Saturday from 7:30 AM to 6:00 Pm.  I need to calculate every other Saturday between 8-26-18 and 12-12-18 (is this clear?)
       
      here is the code I have so far. I am just missing this last part:
      ; Step 7 Func SendData() ;******************************************************************************* ; Sends all collected data to the Excel file in correct order for Upload ;******************************************************************************* MsgBox($MB_ICONINFORMATION, "Scheduler_Bot", "Sending Data", 2) ; Loop Counters $LoopCount = 0 $Array_Index = 0 $DayIndex = 0 $dataIndex = 0 ; Counter for the day of the week Local $dCount = 2 ; Counter for the numbers of Ys Local $yesCount = 0 ; Excel Write Counter (VERY IMPORTANT!) Local $EWriteCount = 2 ; Declare the global shift arrays (Sunday - Saturday) Global $ShiftDaySU[100][600] Global $ShiftDayM[100][600] Global $ShiftDayT[100][600] Global $ShiftDayW[100][600] Global $ShiftDayR[100][600] Global $ShiftDayF[100][600] Global $ShiftDayS[100][600] Global $sDates[400] While $Formatted_Names[$dataIndex] <> $Formatted_Names[$IndexRows] ; $LoopCount < $IndexRows $ACounter = 0 ; Array counter ; Gets the Start date from the array $Temp = $StartDate[$Array_Index] $TempStart = StringLeft($Temp, 8) $StartTempYear = StringLeft($TempStart, 4) $StartTempMonth = StringMid($TempStart, 5, 2) $StartTempDay = StringRight($TempStart, 2) ; Gets the End date from the array $Temp = $EndDate[$Array_Index] $TempEnd = StringLeft($Temp, 8) $EndTempYear = StringLeft($TempEnd, 4) $EndTempMonth = StringMid($TempEnd, 5, 2) $EndTempDay = StringRight($TempEnd, 2) ; The starting date (in value form) $sdate = _DateToDayValue($StartTempYear, $StartTempMonth, $StartTempDay) ;_DateToDayValue(2019,1,9) ;ConsoleWrite(@CRLF & "$start date " & $sdate & @CRLF & @CRLF) ; The ending date (in value form) $edate = _DateToDayValue($EndTempYear, $EndTempMonth, $EndTempDay) ;_DateToDayValue(2019,4,9) ;ConsoleWrite(@CRLF & "$end date " & $edate & @CRLF & @CRLF) ; Variables for readability Local $iYear, $iMonth, $iDay ;Stores what day of the week that shift lands on Local $tSU = _Excel_RangeRead($OpenWorkbook, Default, "I" & $dCount) If $tSU = "Y" Then $yesCount = 1 EndIf Local $tM = _Excel_RangeRead($OpenWorkbook, Default, "J" & $dCount) If $tM = "Y" Then $yesCount += 1 EndIf Local $tT = _Excel_RangeRead($OpenWorkbook, Default, "K" & $dCount) If $tT = "Y" Then $yesCount += 1 EndIf Local $tW = _Excel_RangeRead($OpenWorkbook, Default, "L" & $dCount) If $tW = "Y" Then $yesCount += 1 EndIf Local $tR = _Excel_RangeRead($OpenWorkbook, Default, "M" & $dCount) If $tR = "Y" Then $yesCount += 1 EndIf Local $tF = _Excel_RangeRead($OpenWorkbook, Default, "N" & $dCount) If $tF = "Y" Then $yesCount += 1 EndIf Local $tS = _Excel_RangeRead($OpenWorkbook, Default, "O" & $dCount) If $tS = "Y" Then $yesCount += 1 EndIf ConsoleWrite(@CRLF & @CRLF) ConsoleWrite($tSU & @CRLF) ConsoleWrite($tM & @CRLF) ConsoleWrite($tT & @CRLF) ConsoleWrite($tW & @CRLF) ConsoleWrite($tR & @CRLF) ConsoleWrite($tF & @CRLF) ConsoleWrite($tS & @CRLF) ConsoleWrite(@CRLF & @CRLF) ; Check to see if they work every other week Local $rotationWeek = _Excel_RangeRead($OpenWorkbook, Default, "U" & $dCount) If $rotationWeek = "0" Then ; Do nothing Else If $rotationWeek = 1 ; Do something Else ; $rotationWeek = 2 ; Do something EndIf EndIf Local $repeatWeek = _Excel_RangeRead($OpenWorkbook, Default, "V" & $dCount) If $rotationWeek = "0" Then ; Do nothing Else If $rotationWeek = 1 ; Do something Else ; $rotationWeek = 2 ; Do something EndIf EndIf While $yesCount > 0 If $tSU = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 1 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDaySU[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDaySU[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "SU " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Sunday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tSU = "N" ElseIf $tM = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 2 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDayM[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDayM[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "M " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Monday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tM = "N" ElseIf $tT = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 3 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDayT[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDayT[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "T " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Tuesday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tT = "N" ElseIf $tW = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 4 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDayW[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDayW[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "W " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Wednesday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tW = "N" ElseIf $tR = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 5 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDayR[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDayR[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "R " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Thursday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tR = "N" ElseIf $tF = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 6 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDayF[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDayF[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "F " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Friday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tF = "N" ElseIf $tS = "Y" Then For $Index = $sdate To $edate _DayValueToDate($Index, $iYear, $iMonth, $iDay) ; Finds the day based on its numerical value (1 = Sunday) If _DateToDayOfWeek($iYear, $iMonth, $iDay) = 7 Then $Temp = $iYear & "-" & $iMonth & "-" & $iDay & "T" & "00" & ":" & "00" & ":" & "00" & ":" & "000" $ShiftDayS[$ACounter][$DayIndex] = $Temp _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $ShiftDayS[$ACounter][$DayIndex], "AI" & $EWriteCount) ; Send Name _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Formatted_Names[$dataIndex], "AA" & $EWriteCount) ; Send Start Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $StartTimes[$dataIndex], "AB" & $EWriteCount) ; Send End Time _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $EndTimes[$dataIndex], "AC" & $EWriteCount) ; Send Work Hours _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $HoursWorked[$dataIndex], "AD" & $EWriteCount) ; Send Work Group _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkGroup[$dataIndex], "AE" & $EWriteCount) ; Send Department _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkDepartment, "AF" & $EWriteCount) ; Send Supervisor _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $Supervisors[$dataIndex], "AG" & $EWriteCount) ; Send Notes _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, $WorkNotes[$dataIndex], "AH" & $EWriteCount) ; Send Shift Number $tempStime = StringReplace($StartTimes[$dataIndex], ":", "") $tempEtime = StringReplace($EndTimes[$dataIndex], ":", "") _Excel_RangeWrite($OpenWorkbook, $OpenWorkbook.ActiveSheet, "S " & $tempStime & "-" & $tempEtime, "AJ" & $EWriteCount) $ACounter += 1 $EWriteCount += 1 ConsoleWrite(@CRLF & "Saturday " & $Temp & @CRLF) EndIf Next $yesCount -= 1 $tS = "N" Else ;Error Nothing equals "Y" ConsoleWrite(@CRLF & "Error Nothing equals 'Y'" & @CRLF) EndIf $DayIndex += 1 $LoopCount += 1 WEnd $Array_Index += 1 $dataIndex += 1 $dCount += 1 WEnd MsgBox($MB_ICONINFORMATION, "Scheduler_Bot", "Finished Sending Data", 2) EndFunc  
    • By nooneclose
      Is it possible to use Autoit to find every Monday within a date range? An example would be I want to find every Monday between 1/9/19 through 4/9/19. Then Autoit would give me all the dates on which Monday lands between those two dates. 
      Sorry but I don't have any code so far. I was wondering if it was even possible. I read the help file and I didn't see a function that could do that. 
×
×
  • Create New...